Microgeneration certification scheme
Contents |
[edit] Introduction
The Microgeneration Certification Scheme MCS was launched in 2007 as a Government backed scheme, in April 2018, the Scheme transferred to the MCS Service Company Limited, and the MCS Charitable Foundation. Today it forms a key element of the current Government Boiler Upgrade Scheme (BUS), and other funding mechanisms, requiring installers to be certified by the scheme and also to use products recognised by MCS via the Product Eligibility List (PEL).
In July 2023 the MCS website contained just over 4,000 MCS qualified installers in the UK. The search function of the website to find installers can be found here https://mcscertified.com/find-an-installer/
MCS website also contains products that meet MCS standards currently containing just over 65,000 products. The search function of the website to find products can be found here https://mcscertified.com/product-directory/
The Product Eligibility List (PEL) is a shorter list which is published by Ofgem these list products that meet MCS standards, but are specifically air, ground and water source heat pumps as well as biomass boilers. There are currently there are just under 3,000 products covering these areas, all of which are recognised by the current Boiler Upgrade Scheme. .
Some of the financial incentives that are on offer by the government, previously the Feed-In tariff and the Renewable Heat Incentive (now closed) and today the Boiler Upgrade Scheme (BUS) require confirmation of accreditation to the Microgeneration Scheme of product and installer, as well as requiring an up to date EPC.
[edit] Technologies covered by the MCS scheme
The Microgeneration certification scheme covers the following electricity producing technologies which have a capacity of up to 50kW and heat producing of up to 45kW:
- Air source heat pumps.
- Exhaust air heat pump.
- Gas absorption heat pump.
- Biomass.
- Ground/water heat pump.
- Micro combined heat and power.
- Pitched roof installation kit.
- Solar photovoltaics.
- Solar thermal.
- Solar assisted heat pump.
- Wind turbines.
[edit] Certification
The quality assurance scheme confirms the reliability and quality of products and installers. The certification is undertaken by a third party organisation or Certification Body and confirms compliance with the technical specification. Certification Bodies must be accredited by UKAS and licensed by the licensee to issue certificates. All the standards and scheme requirements are available as MCS Standards to download.
[edit] Installers and product lists
It is possible to find a list of accredited installers from the MSC Installer List and for products, from the MSC Product List.
[edit] Reform
For information about changes to the MCS, see: Microgeneration Certification Scheme 2020.
[edit] Related articles on Designing Buildings
- BSRIA domestic hot water heat pumps testing.
- Microgeneration.
- Non-domestic building services compliance guide.
- Domestic building services compliance guide.
- Renewable energy.
- Making the most of renewable energy systems DG 531.
- Microgeneration Certification Scheme 2020.
- Micro CHP.
- Micro grid.
- Feed-In tariff.
- Renewable Heat Incentive.
- Air source heat pumps.
- Biomass.
- Ground source heat pump.
- Renewable Energy Consumer Code RECC.
- Solar photovoltaics.
- Solar thermal.
- Wind turbine.
[edit] External references
Featured articles and news
How can digital twins boost profitability within construction?
A brief description of a smart construction dashboard, collecting as-built data, as a s site changes forming an accurate digital twin.
Unlocking surplus public defence land and more to speed up the delivery of housing.
The Planning and Infrastructure bill oulined
With reactions from IHBC and others on its potential impacts.
Farnborough College Unveils its Half-house for Sustainable Construction Training.
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Architects Academy at an insulation manufacturing facility
Programme of technical engagement for aspiring designers.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.
Building Engineering Business Survey Q1 2025
Survey shows growth remains flat as skill shortages and volatile pricing persist.